Assembly · Step 1 of 4

Assembling the Wooden Boxes

This guide covers the assembly of your Green Divider's wooden planter boxes. Before starting, confirm all quantities match those listed below and prepare a clear, level workspace. This step is best completed with two people.

Stack components in a safe location away from surfaces that can scratch the wood finish. Identify the interior vs exterior faces before starting — place finished sides face up to protect them during assembly.

Assembly Video

Watching the full video before beginning is highly recommended.

Box Contents

Confirm you have all of the following items before beginning assembly:

Liquid Level Sensor×1
Metal Camlock Dowels×16
Wooden Dowels×10
Wood Screws×16
Side Panels×8
Front Panels×8
Base Panels×4

Assembling the Planting Boxes (×4)

01

Front Panels

Grab a screwdriver and (4) metal dowels. Screw the (4) metal dowels into the threaded inserts on the Front Panels. Take care not to overtighten.

Repeat for all (8) Front Panels.

02

Side Panels

Press (4) camlocks fully into the holes of the Side Panel, small arrows on the camlocks pointing outward toward the small hole on the side of the Side Panel.

Repeat for all (8) Side Panels.

03

Attaching the Side Panels to the Front Panels

Slide (2) Side Panels onto the dowels sticking out of one of the Front Panels. Ensure the Side Panels are fully pushed in and flush with the Front Panel.

Flip the three connected boards on their side. There should be three holes on the Front Panel facing up.

Attach a second Front Panel, ensuring the three small holes on the edge of the board are facing the same direction as the other Side Panel.

Tighten all (8) camlocks with a quarter right turn until snug. Take care not to overtighten. The camlocks can be easily damaged. The boards should all pull together snugly.

Repeat the process three times to make (4) boxes total.

04

Bottom Panel

Insert (2) wooden dowels into the center holes on the Front Panels.

Take one Bottom Panel and align it with the wooden dowels, finish side up.

Take (4) wood screws and screw them into the 4 wood screw holes in the Bottom Panel using a screwdriver.

Repeat for all (4) boxes.

Base Box Instructions

01

Front & Rear Panels

Lay out the Front Panel of the Base Box.

Screw (4) metal dowels into the threaded inserts of the Front Panel. Take care not to overtighten.

Set the Front Panel aside.

Lay out the Rear Panel of the Base Box.

Screw (4) metal dowels into the threaded inserts of the Rear Panel. Take care not to overtighten.

Set the Rear Panel aside.

02

Side Panels

Press (4) camlocks into the four holes of the Side Panel. Ensure that the small arrows on the camlocks are pointed outwards, towards the small holes on the sides of the Side Panel.

Repeat for all (2) Side Panels.

03

Attach the Side Panels to the Front & Back Panels

Ensuring the lip of all the panels is facing the same direction, slide (2) Side Panels onto the dowels sticking out of the Front Panel. Ensure the Side Panels are fully pushed in and flush with the Front Panel.

Attach the Back Panel, ensuring the lip on all four panels is facing the same direction.

Flip the box so that the lip is facing up.

Tighten all (8) camlocks with a quarter right turn until snug. Take care not to overtighten. The camlocks can be easily damaged. The boards should all pull together snugly.

04

Bottom Panel

Place the Bottom Panel inside the lip.

With the two round holes on the Back Panel facing away from you, the rectangular hole on the Bottom Panel must be on the right.

If the rectangular hole is oriented incorrectly, the irrigation tubing will not route properly in Step 4 of assembly. Double-check before securing.

Take (6) wood screws and screw them into the 6 wood screw holes in the Bottom Panel using a screwdriver.

Flip the Bottom Box over and set aside.